NEFC Departments gathered at St 13 in Blue Ash to train on high-rise operations. Training consisted of the first three incoming crews setting up for a major high-rise incident. The first incoming company deployed a large diameter hose to the third floor of the training tower while the engine operator obtained a water source & hooked up to the FDC. The second incoming company deployed with a high-rise pack to the third floor & tagged the standpipe. The third company assisted with any additional duties needed. Companies went through this scenario several times using different trucks from collaborative departments to re-famiiarize everyone with the equipment used in surrounding departments.